Before

proj-narmco-beforeNarmco Completed 5

After

Narmco CEL/PMP

Customer Need:
Client wanted to modernize their front lobby with a fresh, professional look with modest budget.

Concerns / Obstacles:

  • 30-foot ceilings required specialized equipment and safety planning
  • Broken granite stair treads that needed repair before coverage
  • Work had to be completed during regular business hours without shutting down the lobby

SRS Solution:
Our team repaired all holes in the drywall, repainted wall and ceiling, polished the railings, and completed repairs to the marble flooring. We repaired the broken granite stairs, installed new commercial grade anti-slip vinyl stair treads and landings. updated the lobby lighting for a complete refresh.

Value Added:

  • Seamless execution in a high-traffic environment
  • Full restoration without any operational downtime
  • Durable materials and a polished finish that elevated the entrance experience

Outcome:
A fully refreshed, modern lobby — completed safely during operational hours — with a highly satisfied customer.

Services

Front Lobby Upgrade

Year

2025